Case Studies

Slide background

Project Duration: 16 days , Start on site 18/11/13 and completion 09/12/13 Type of Project: Brand New Co Op Food Acquisition Store Scope of Work Running simultaneously with another Co Op store at East Hill, Wandsworth the essence of this project was the installation of a new build store at the ground level of a

More info

Case Study: Co-Op East Hill, Wandsworth

A Brand New Co Op Acquisition Store

Co-Op-Buckhold-Square-main

Scope of Work Running simultaneously as another Co Op store at Buckhold Square, Wandsworth the essence of this project was the installation of a new build store converting a wine bar into a Co Op convenience store. As nominated refrigeration contractor we began by carrying out a thorough and detailed survey of the site layout

More info

Case Study: Residential Air Conditioning Installation

Air Conditioning installation to residential premises.

case-study-residential-main

Scope of Work For this project we were approached by the owner of the property who had a need to keep his house cool in the summer and to provide low cost heating to supplement gas central heating within the house in the winter. On our initial visit our design engineer visited the premises and

More info

Categories

Archives